Wrapping the Berliner Tor Center

Installer Carsten Thormann chose Avery Dennison Facade Film as a cost effective and practical material. Timescales were tight, with outside elements to be completed at the same time as the interior renovation. A further complication was that the site was at least three hours away by road, and the project had to be quoted on a fixed-fee basis rather than an hourly rate.